Peak load management and curtailment, Max seriesSample
by Mewar Associates (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mewar Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Max service of peak load management and curtailment by Mewar covers 6 curtailable load options (0.5 MW to 50 MW). Highlights: real-time dashboards, support for grid operators and reduced peak demand charges. Typically used for DISCOMs needing peak relief, commercial buildings and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mewar
- Model
- MEW-ED8 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWMEW-ED8-01 | Curtailable load: 0.5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load1 MWMEW-ED8-02 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load5 MWMEW-ED8-03 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWMEW-ED8-04 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWMEW-ED8-05 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWMEW-ED8-06 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 0.5 MW to 50 MW (see variants) |
|---|---|
| Programme | Utility DRmade to order: Aggregator DR / TOD optimisation |
| Control | Automated through SCADAmade to order: Manual |
| Notice | Day aheadmade to order: 2 hours / 15 minutes |
| Duration per event | 4 hoursmade to order: 1 hour |
| Events per year | 50 |
| Metering | Existing meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | 10-day averagemade to order: Regression |
| Reporting | Monthly savings |
| Contract term | 1 yearmade to order: 3 years |