The Pro service of peak load management and curtailment by Mewar covers 3 curtailable load options (10 MW to 50 MW). Highlights: integration with plant process limits, real-time dashboards and support for grid operators. Suited to industrial plants with flexible load, commercial buildings and DISCOMs needing peak relief. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mewar
- Model
- MEW-ED1 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load10 MWMEW-ED1-01 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load25 MWMEW-ED1-02 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load50 MWMEW-ED1-03 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | on quote |
Specifications
| Curtailable load | 10 MW to 50 MW (see variants) |
|---|---|
| Programme | TOD optimisation |
| Control | Manual |
| Notice | 15 minutesmade to order: Day ahead / 2 hours |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | Unlimited |
| Metering | Dedicated interval meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | 10-day average |
| Reporting | Event reportmade to order: Monthly savings |
| Contract term | 3 yearsmade to order: 1 year |