Automated demand response controller, Duo 2 seriesSample
by Mewarkavach Capital Advisors (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mewarkavach Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo 2 service of automated demand response controller by Mewarkavach covers 4 curtailable load options (0.5 MW to 10 MW). Key features: revenue for flexible loads, integration with plant process limits and settlement transparency. Typically used for cold storage and water pumping, commercial buildings and industrial plants with flexible load. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mewarkavach
- Model
- MEW-C48 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWMEW-C48-01 | Curtailable load: 0.5 MW | 1 MW · Assessment in 2-3 weeks | on quote |
| Curtailable load1 MWMEW-C48-02 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | on quote |
| Curtailable load5 MWMEW-C48-03 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load10 MWMEW-C48-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | on quote |
Specifications
| Curtailable load | 0.5 MW to 10 MW (see variants) |
|---|---|
| Programme | TOD optimisation |
| Control | Manualmade to order: Automated through SCADA |
| Notice | 2 hoursmade to order: Day ahead / 15 minutes |
| Duration per event | 4 hours |
| Events per year | 20made to order: 50 / Unlimited |
| Metering | Existing metermade to order: Dedicated interval meter |
| Incentive sharing | 70:30 customer:aggregator |
| Baseline method | Regressionmade to order: 10-day average |
| Reporting | Event reportmade to order: Monthly savings |
| Contract term | 1 year |