Catalogue / Energy audits

No photo yet

Electrical load and power quality audit, Edge seriesSample

by Mewarkavach Capital Advisors (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mewarkavach Capital Advisors (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mewarkavach Edge electrical load and power quality audit, offered in 3 connected load options from 1 MW to 10 MW. Highlights: statutory forms and BEE reporting, savings quantified with measured data and verification after implementation. Suited to PAT designated consumers, industrial plants and commercial buildings. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mewarkavach
Model
MEW-9B9 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load1 MWMEW-9B9-01Connected load: 1 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load5 MWMEW-9B9-02Connected load: 5 MW1 site · Audit in 1-2 weeksfor verified buyers
Connected load10 MWMEW-9B9-03Connected load: 10 MW1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Connected load1 MW to 10 MW (see variants)
Audit levelInvestment-grade auditmade to order: Walk-through / Detailed audit
InstrumentsPower analyser, thermal cameramade to order: Ultrasonic flow meter, lux meter
AuditorBEE accredited energy auditor
ReportSavings opportunities with payback
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration7 daysmade to order: 3 days / 14 days
CoverageElectrical
StatutoryForm-1 and Form-2 filing
DeliverableReport and monitoring plan
Follow-upNot includedmade to order: Verification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited