Automated demand response controller, Elite seriesSample
by Mewarkavach Capital Advisors (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mewarkavach Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mewarkavach Elite automated demand response controller, offered in 3 curtailable load options from 10 MW to 50 MW. Highlights: real-time dashboards, settlement transparency and support for grid operators. Suited to cold storage and water pumping, industrial plants with flexible load and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mewarkavach
- Model
- MEW-C45 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load10 MWMEW-C45-01 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWMEW-C45-02 | Curtailable load: 25 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load50 MWMEW-C45-03 | Curtailable load: 50 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
Specifications
| Curtailable load | 10 MW to 50 MW (see variants) |
|---|---|
| Programme | TOD optimisationmade to order: Utility DR / Aggregator DR |
| Control | Automated through SCADA |
| Notice | 15 minutes |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | 50 |
| Metering | Existing meter |
| Incentive sharing | 80:20made to order: 70:30 customer:aggregator |
| Baseline method | Regressionmade to order: 10-day average |
| Reporting | Monthly savings |
| Contract term | 3 years |