Catalogue / Lighting poles & arms

No photo yet

Stepped tubular pole, Xtra 9 seriesSample

by Mewar Luminaires (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mewar Luminaires (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Stepped tubular pole from Mewar, Xtra 9 series: 4 height options between 7.5 m and 12 m. Key features: customisable brackets and arms, welded longitudinal seam tested and inspected and hot-dip galvanised inside and outside. Suited to parks and campuses, highway medians and industrial yards. Designed and tested to IS 2713 (Part 1-3), IS 2629 and IS 4759. Lead time 4-5 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mewar
Model
MEW-AB4 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
4-5 weeks
Warranty
12 months from supply
Standards
IS 2713 (Part 1-3), IS 2629, IS 4759
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR nearest railhead
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Height7.5 mMEW-AB4-01Height: 7.5 m1 nos · 4-5 weekson quote
Height9 mMEW-AB4-02Height: 9 m1 nos · 4-5 weekson quote
Height11 mMEW-AB4-03Height: 11 m1 nos · 4-5 weekson quote
Height12 mMEW-AB4-04Height: 12 m1 nos · 4-5 weekson quote

Specifications

Height7.5 m to 12 m (see variants)
Pole shapeOctagonal
MaterialMild steel IS 2062made to order: Steel tubes IS 1161 / Aluminium
Wall thickness3.65 mmmade to order: 3 mm / 4 mm / 5 mm
GalvanisingHot dip 86 micronmade to order: Hot dip 120 micron
BaseFlange with anchor bolts
ArmWithout armmade to order: Single arm / Double arm
Arm length2 mmade to order: 1.5 m / 3 m
Design wind speed47 m/smade to order: 39 m/s / 50 m/s
FinishHDG + powder coat
DoorWithout door
Earth studProvided
FoundationBolt cage

BARREL: Bharat Atom Renewable Resources Energy Limited