Catalogue / Biomass boilers & gasifiers
Biomass gasifier with gas engine, Core seriesSample
by Munnaragni Waste to Energy (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Munnaragni Waste to Energy (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Munnaragni Core biomass gasifier with gas engine, offered in 4 capacity options from 5 TPH to 50 TPH. Highlights: CPCB emission norm compliance, heat-recovery economiser option and multi-fuel capability for local biomass. Used by captive steam supply, textile and food processing and biomass power plants. Designed and tested to IBR 1950, IS 2002 and IS 5072. Lead time 10-14 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Munnaragni
- Model
- MUN-E59 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 weeks
- Warranty
- 18 months from supply
- Standards
- IBR 1950, IS 2002, IS 5072
- Delivers to
- West India
- GST rate
- 12 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity5 TPHMUN-E59-01 | Capacity: 5 TPH | 1 nos · 10-14 weeks | on quote |
| Capacity10 TPHMUN-E59-02 | Capacity: 10 TPH | 1 nos · 10-14 weeks | on quote |
| Capacity20 TPHMUN-E59-03 | Capacity: 20 TPH | 1 nos · 16-24 weeks | on quote |
| Capacity50 TPHMUN-E59-04 | Capacity: 50 TPH | 1 nos · 16-24 weeks | on quote |
Specifications
| Capacity | 5 TPH to 50 TPH (see variants) |
|---|---|
| Fuel | Rice huskmade to order: Wood chips / Agro residue pellets / Bagasse |
| Steam pressure | 10.5 bar |
| Firing system | Travelling gratemade to order: Fluidised bed / Dumping grate |
| Efficiency | 78%made to order: 82% / 86% |
| Design code | IBR |
| Ash handling | Automatic screwmade to order: Manual |
| Emission control | ESPmade to order: Multi-cyclone / Bag filter |
| Fuel feeding | Belt conveyor |
| Control | Basic panel |
| Insulation | Ceramic fibre / mineral wool |