Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

Flue gas cleaning train for WtE, Prime seriesSample

by Munnaragni Waste to Energy (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Munnaragni Waste to Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Prime range of flue gas cleaning train for WtE by Munnaragni covers 3 plant capacity options (500 TPD to 1000 TPD). Highlights: steam turbine heat recovery, bottom ash used in brick or road base and automated crane and grate control. Typically used for municipal corporations, urban local bodies and PPP waste-to-energy developers. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 24-30 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Munnaragni
Model
MUN-7E1 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
24-30 months
Warranty
24 months
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity500 TPDMUN-7E1-01Plant capacity: 500 TPD1 lot · 24-30 monthson quote
Plant capacity750 TPDMUN-7E1-02Plant capacity: 750 TPD1 lot · 24-30 monthson quote
Plant capacity1000 TPDMUN-7E1-03Plant capacity: 1000 TPD1 lot · 24-30 monthson quote

Specifications

Plant capacity500 TPD to 1000 TPD (see variants)
TechnologyGasification
FuelMSWmade to order: RDF / Industrial waste
Calorific value3200 kcal/kg
Steam parameters42 bar / 400 C
Power output10 MWmade to order: 3 MW / 20 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited