Catalogue / Waste-to-energy (incineration, RDF)
Waste-to-energy moving grate system, Elite seriesSample
by Munnaragni Waste to Energy (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Munnaragni Waste to Energy (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Elite range of waste-to-energy moving grate system by Munnaragni covers 4 plant capacity options (500 TPD to 1500 TPD). Design: steam turbine heat recovery, odour control through negative pressure bunker and bottom ash used in brick or road base. Suited to municipal corporations, urban local bodies and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Munnaragni
- Model
- MUN-A74 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 10 lot
- Lead time
- 18-24 months
- Warranty
- Performance guarantee as per contract
- Standards
- SWM Rules 2016, CPCB emission norms, IBR 1950
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity500 TPDMUN-A74-01 | Plant capacity: 500 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity750 TPDMUN-A74-02 | Plant capacity: 750 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity1000 TPDMUN-A74-03 | Plant capacity: 1000 TPD | 10 lot · 24-30 months | for verified buyers |
| Plant capacity1500 TPDMUN-A74-04 | Plant capacity: 1500 TPD | 10 lot · 24-30 months | for verified buyers |
Specifications
| Plant capacity | 500 TPD to 1500 TPD (see variants) |
|---|---|
| Technology | Gasification |
| Fuel | MSW |
| Calorific value | 2500 kcal/kg |
| Steam parameters | 67 bar / 485 Cmade to order: 42 bar / 400 C |
| Power output | 3 MWmade to order: 10 MW / 20 MW |
| Flue gas cleaning | SNCR, lime, bag filter, activated carbon |
| Residence time | > 2 s at 850 C |
| Ash handling | Wet bottom ash extractor |
| Dioxin control | Activated carbon injection |
| Monitoring | CEMS online to CPCB |
| Design life | 25 years |