Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

RDF-fired boiler and turbine plant, Smart 9 seriesSample

by Munnaragni Waste to Energy (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Munnaragni Waste to Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

RDF-fired boiler and turbine plant from Munnaragni, Smart 9 series: 3 plant capacity options between 750 TPD and 1500 TPD. Design: steam turbine heat recovery, odour control through negative pressure bunker and continuous emission monitoring linked to CPCB. Typically used for municipal corporations, urban local bodies and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Munnaragni
Model
MUN-264 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
18-24 months
Warranty
Performance guarantee as per contract
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Ex-works, freight extra at actuals
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity750 TPDMUN-264-01Plant capacity: 750 TPD1 lot · 18-24 monthsfor verified buyers
Plant capacity1000 TPDMUN-264-02Plant capacity: 1000 TPD1 lot · 18-24 monthsfor verified buyers
Plant capacity1500 TPDMUN-264-03Plant capacity: 1500 TPD1 lot · 18-24 monthsfor verified buyers

Specifications

Plant capacity750 TPD to 1500 TPD (see variants)
TechnologyMoving gratemade to order: Fluidised bed / Gasification
FuelRDF
Calorific value1500 kcal/kg
Steam parameters67 bar / 485 C
Power output20 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited