Catalogue / Grid connectivity & GNA applications
Evacuation approval for solar and wind parks, Duo seriesSample
by Munnar Logistics (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Munnar Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Evacuation approval for solar and wind parks from Munnar, Duo series: 6 capacity applied options between 10 MW and 1000 MW. Highlights: eligibility check before filing, regular updates of queue status and bank guarantee timeline tracking. Typically used for renewable developers, storage developers and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Munnar
- Model
- MUN-F38 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWMUN-F38-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied50 MWMUN-F38-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied100 MWMUN-F38-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied250 MWMUN-F38-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWMUN-F38-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied1000 MWMUN-F38-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | Bothmade to order: Connectivity / GNA |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged through partner bank |
| Studies | Detailed power system study |
| Portal handling | CTUIL portal |
| Team | Dedicated manager |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Responded within 2 days |
| Fee basis | Fixedmade to order: Fixed plus success |