Catalogue / Power system studies (load flow, short circuit, grid code)
Dynamic stability and fault ride-through study, Titan seriesSample
by Munnar Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Munnar Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Munnar Titan dynamic stability and fault ride-through study, offered in 5 network scale options from 11 kV plant to 220 kV system. Key features: PSS/E and PSCAD model support, models acceptable to STU and CTUIL and reactive power capability curves. Suited to utilities and consultants, BESS integrators and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Munnar
- Model
- MUN-5E7 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantMUN-5E7-01 | Network scale: 11 kV plant | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale33 kV plantMUN-5E7-02 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale66 kV systemMUN-5E7-03 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale132 kV systemMUN-5E7-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale220 kV systemMUN-5E7-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | for verified buyers |
Specifications
| Network scale | 11 kV plant to 220 kV system (see variants) |
|---|---|
| Study type | Harmonicsmade to order: Load flow and short circuit / Dynamic and transient / Protection coordination |
| Software | PSS/Emade to order: ETAP / DIgSILENT PowerFactory |
| Model data | Utility network modelmade to order: Client single line diagram and data |
| Deliverables | Study report with resultsmade to order: Model files and relay settings |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Utility submission support |
| Scenarios | Multiple dispatch cases |
| Team | Power system engineer |
| Turnaround | 2-3 weeks |
| Validation | Compared with measured datamade to order: Peer review |