Catalogue / Resource assessment (solar, wind, hydro)
Hydro resource and flow duration study, Volt 7 seriesSample
by Munnar Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Munnar Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Volt 7 service of hydro resource and flow duration study by Munnar covers 6 measurement duration options (Desktop study to 24 months). Key features: independent bankable estimate, extreme wind and wake studies and long-term correction using reference data. Typically used for state agencies mapping resource, hybrid project planners and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Munnar
- Model
- MUN-C88 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Campaign 3-24 months
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyMUN-C88-01 | Measurement duration: Desktop study | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration3 monthsMUN-C88-02 | Measurement duration: 3 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration6 monthsMUN-C88-03 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration12 monthsMUN-C88-04 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration18 monthsMUN-C88-05 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration24 monthsMUN-C88-06 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | for verified buyers |
Specifications
| Measurement duration | Desktop study to 24 months (see variants) |
|---|---|
| Technology | Small hydromade to order: Solar GHI/DNI / Wind |
| Data source | On-site measurementmade to order: Satellite and reanalysis / Hybrid with MCP |
| Equipment | 80-120 m met mast with LiDARmade to order: Class A pyranometer station |
| Uncertainty | Bankable assessmentmade to order: P50/P90 with uncertainty budget |
| Modelling | PVsyst, SAM |
| Deliverable | Resource report |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Single site |
| Maintenance | Remote health checksmade to order: Quarterly site visit |
| Turnaround | Report within 6 weeks of datamade to order: Report in 3 weeks |