Catalogue / Steam turbines & condensers
Condensing steam turbine, Duo 4 seriesSample
by Munnarloha Power Plant Equipment (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Munnarloha Power Plant Equipment (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Duo 4 range of condensing steam turbine by Munnarloha covers 5 output options (12 MW to 250 MW). Key features: extraction for process steam, fully assembled skid for small units and electro-hydraulic governing system. Typically used for captive power plants, sugar cogeneration and utility power stations. Designed and tested to IEC 60045, IS 4351 and HEI standards. Lead time 14-20 months; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Munnarloha
- Model
- MUN-AD7 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 14-20 months
- Warranty
- 18 months
- Standards
- IEC 60045, IS 4351, HEI standards
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Door delivery in metro cities
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Output12 MWMUN-AD7-01 | Output: 12 MW | 1 nos · 14-20 months | for verified buyers |
| Output30 MWMUN-AD7-02 | Output: 30 MW | 1 nos · 14-20 months | for verified buyers |
| Output60 MWMUN-AD7-03 | Output: 60 MW | 1 nos · 14-20 months | for verified buyers |
| Output120 MWMUN-AD7-04 | Output: 120 MW | 1 nos · 14-20 months | for verified buyers |
| Output250 MWMUN-AD7-05 | Output: 250 MW | 1 nos · 14-20 months | for verified buyers |
Specifications
| Output | 12 MW to 250 MW (see variants) |
|---|---|
| Turbine type | Back-pressuremade to order: Condensing / Extraction |
| Inlet steam | 67 ata / 485 Cmade to order: 45 ata / 440 C / 130 ata / 535 C |
| Speed | 5500 rpm with gearbox |
| Exhaust pressure | 0.1 atamade to order: 3.5 ata / 8 ata |
| Condenser type | Shell and tubemade to order: Air cooled |
| Tube material | SS 304 |
| Governing | Electro-hydraulic |
| Generator coupling | Gearbox |
| Extraction | Doublemade to order: Single / None |
| Lube oil system | AC and DC driven pumps |