Catalogue / Static transfer switches
Three-phase STS cabinet, Volt 5 seriesSample
by Mysorearc UPS Systems (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysorearc UPS Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Volt 5 range of three-phase STS cabinet by Mysorearc covers 5 rating options (125 A to 1600 A). Design: event logging and remote alarms, maintenance bypass for hot service and thyristor-based switching under 6 ms. Suited to telecom exchanges, dual UPS bus architecture and single-corded server loads in data centres. Designed and tested to IEC 62310-3, IEC 62310-1 and IEC 62310-2. Lead time 6-8 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysorearc
- Model
- MYS-B49 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 6-8 weeks
- Warranty
- 12 months from commissioning
- Standards
- IEC 62310-3, IEC 62310-1, IEC 62310-2
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating125 AMYS-B49-01 | Rating: 125 A | 1 nos · 6-8 weeks | on quote |
| Rating250 AMYS-B49-02 | Rating: 250 A | 1 nos · 6-8 weeks | on quote |
| Rating400 AMYS-B49-03 | Rating: 400 A | 1 nos · 6-8 weeks | on quote |
| Rating800 AMYS-B49-04 | Rating: 800 A | 1 nos · 6-8 weeks | on quote |
| Rating1600 AMYS-B49-05 | Rating: 1600 A | 1 nos · 6-8 weeks | on quote |
Specifications
| Rating | 125 A to 1600 A (see variants) |
|---|---|
| Phase | 3-phase 4-wiremade to order: 1-phase |
| Rated voltage | 400 V ACmade to order: 230 V AC / 415 V AC |
| Transfer time | Below 4 msmade to order: Below 6 ms |
| Transfer type | Break-before-makemade to order: Make-before-break |
| Switching device | SCR thyristors |
| Source priority | Preferred source selectable |
| Maintenance bypass | None |
| Overload | 150% 1 minmade to order: 125% 10 min |
| Efficiency | Above 99% |
| Display | Touchscreenmade to order: LCD |
| Communication | Dry contactsmade to order: SNMP / Modbus RTU |
| Mounting | 1U/2U rack |