Catalogue / Live-line & hot-line washing
Live-line insulator washing, Pro seriesSample
by Mysore Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Live-line insulator washing from Mysore, Pro series: 4 voltage level options between 33 kV and 220 kV. Highlights: weather window planning, leakage current monitoring and utility permit coordination. Suited to coastal and industrial pollution zones, renewable evacuation lines and utility transmission networks. Delivered in line with IEC 60815, CEA (Measures relating to Safety) Regulations and IEEE 957. Mobilisation Permit based scheduling; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysore
- Model
- MYS-344 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Permit based scheduling
- Warranty
- As per contract
- Standards
- IEC 60815, CEA (Measures relating to Safety) Regulations, IEEE 957
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level33 kVMYS-344-01 | Voltage level: 33 kV | 1 job · Permit based scheduling | on quote |
| Voltage level66 kVMYS-344-02 | Voltage level: 66 kV | 1 job · Permit based scheduling | on quote |
| Voltage level132 kVMYS-344-03 | Voltage level: 132 kV | 1 job · Permit based scheduling | on quote |
| Voltage level220 kVMYS-344-04 | Voltage level: 220 kV | 1 job · Permit based scheduling | on quote |
Specifications
| Voltage level | 33 kV to 220 kV (see variants) |
|---|---|
| Method | Robotic cleaning |
| Resistivity of water | Demineralised water |
| Scope | Per km of linemade to order: Per tower / Per bay |
| Frequency | Pre-monsoon |
| Crew | Team of 5 with live-line operatormade to order: Linemen with insulated platform |
| Tools | Bucket with insulated boom |
| Safety | Shutdown not requiredmade to order: Approved method statement |
| Outputs | Pre and post leakage current |
| Productivity | 100 insulators per daymade to order: 30 towers per day |
| Licence | Trained under utility protocols |