Catalogue / Installation & erection
Module mounting structure and PV module installation, Elite seriesSample
by Mysore Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mysore Elite module mounting structure and PV module installation, offered in 3 installation scope options from 25 MW to 100 MW. Highlights: mobile team available for remote sites, material reconciliation reports and cable route marking and tray fixing. Suited to utility solar parks, c&I rooftop and ground mount and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysore
- Model
- MYS-729 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Phased by block
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope25 MWMYS-729-01 | Installation scope: 25 MW | 1 MW · Phased by block | on quote |
| Installation scope50 MWMYS-729-02 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
| Installation scope100 MWMYS-729-03 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 25 MW to 100 MW (see variants) |
|---|---|
| Scope | Complete mechanical and electrical erectionmade to order: Structure and module installation / Electrical BoP erection |
| Manpower deployed | 60 technicians plus supervisors |
| Supervision | Site engineer and safety officermade to order: Project manager, engineers, QA/QC |
| Equipment | Pile driver, crane, telehandlermade to order: Own cranes and erection tools |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Daily toolbox talks, PPE, permits |
| Licence | Electrical contractor licencemade to order: Class A contractor registration |
| Insurance | CAR and workmen compensation |
| Reporting | Daily progress reportmade to order: Weekly report with look-ahead plan |
| Payment terms | Monthly running bills |