Catalogue / Cabling, trenching & HDD works
Horizontal directional drilling for road and rail crossings, Smart 9 seriesSample
by Mysore Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mysore Smart 9 horizontal directional drilling for road and rail crossings, offered in 5 cable route length options from 2 km to 50 km. Key features: HDD bore log and as-built survey, dewatering in high water table and warning tape and marker installation. Suited to renewable plant internal networks, industrial plant cabling and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysore
- Model
- MYS-C89 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length2 kmMYS-C89-01 | Cable route length: 2 km | 1 km · Permits may extend timeline | on quote |
| Cable route length5 kmMYS-C89-02 | Cable route length: 5 km | 1 km · Permits may extend timeline | on quote |
| Cable route length10 kmMYS-C89-03 | Cable route length: 10 km | 1 km · Permits may extend timeline | on quote |
| Cable route length20 kmMYS-C89-04 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmMYS-C89-05 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 2 km to 50 km (see variants) |
|---|---|
| Method | Trenchless HDDmade to order: Open trench / Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 1.2 m |
| Cable type | 11/33 kV XLPE |
| Jointing | Heat shrink |
| Restoration | Road and footpath restorationmade to order: Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 50 m per day HDD |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |