Catalogue / Cabling, trenching & HDD works

No photo yet

Horizontal directional drilling for road and rail crossings, Smart 9 seriesSample

by Mysore Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Mysore Smart 9 horizontal directional drilling for road and rail crossings, offered in 5 cable route length options from 2 km to 50 km. Key features: HDD bore log and as-built survey, dewatering in high water table and warning tape and marker installation. Suited to renewable plant internal networks, industrial plant cabling and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mysore
Model
MYS-C89 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Permits may extend timeline
Warranty
Workmanship 12 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length2 kmMYS-C89-01Cable route length: 2 km1 km · Permits may extend timelineon quote
Cable route length5 kmMYS-C89-02Cable route length: 5 km1 km · Permits may extend timelineon quote
Cable route length10 kmMYS-C89-03Cable route length: 10 km1 km · Permits may extend timelineon quote
Cable route length20 kmMYS-C89-04Cable route length: 20 km1 km · Permits may extend timelineon quote
Cable route length50 kmMYS-C89-05Cable route length: 50 km1 km · Permits may extend timelineon quote

Specifications

Cable route length2 km to 50 km (see variants)
MethodTrenchless HDDmade to order: Open trench / Trench plus HDD for crossings
HDD capacityUp to 250 mm boremade to order: Up to 450 mm bore
Trench depth1.2 m
Cable type11/33 kV XLPE
JointingHeat shrink
RestorationRoad and footpath restorationmade to order: Backfill and compaction only
PermissionsClient arranges
TestingInsulation and VLF testmade to order: Hipot and sheath test
Productivity50 m per day HDD
CrewTrenching team of 15made to order: HDD crew of 8 with rig

BARREL: Bharat Atom Renewable Resources Energy Limited