Catalogue / Civil & foundation works

No photo yet

Pre-cast and cast-in-situ foundations for transformers, Duo 6 seriesSample

by Mysore Consultants (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mysore Duo 6 pre-cast and cast-in-situ foundations for transformers, offered in 4 works volume options from 1 MW equivalent to 25 MW equivalent. Highlights: local labour employed where possible, monsoon-ready drainage planning and cube and pile test records. Suited to wind farms, substations and control rooms and solar parks. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mysore
Model
MYS-472 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentMYS-472-01Works volume: 1 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume5 MW equivalentMYS-472-02Works volume: 5 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume10 MW equivalentMYS-472-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume25 MW equivalentMYS-472-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume1 MW equivalent to 25 MW equivalent (see variants)
Foundation typeRamming or screw pile
Concrete gradeM40 for turbine foundation
Pull-out testingRandom test plus lateral load
ReinforcementFe 500D TMT
Roads and drainageMurram road, 4 m wide
BoundaryCompound wall with barbed wire
QualityCube test reports per pourmade to order: NABL lab testing of materials
MachineryPiling rigs and excavatorsmade to order: Batching plant at site
Duration3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited