Wind turbine foundation construction, Duo seriesSample
by Mysore Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mysore Duo wind turbine foundation construction, offered in 4 works volume options from 1 MW equivalent to 25 MW equivalent. Key features: cube and pile test records, pile layout tolerance maintained to design and waterproofing for cable trenches. Typically used for industrial plants, solar parks and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysore
- Model
- MYS-259 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentMYS-259-01 | Works volume: 1 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume5 MW equivalentMYS-259-02 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume10 MW equivalentMYS-259-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentMYS-259-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 25 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing |
| Concrete grade | M25 |
| Pull-out testing | 2% piles tested |
| Reinforcement | Fe 550D |
| Roads and drainage | WBM road with culvertsmade to order: Murram road, 4 m wide / Not included |
| Boundary | Chain link fence 2.4 mmade to order: Compound wall with barbed wire |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Piling rigs and excavators |
| Duration | 3-6 months |
| Payment terms | Item rate with retentionmade to order: Measured running bills |