Catalogue / Substation & line O&M
Transmission line patrolling and maintenance, Core 3 seriesSample
by Mysore Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core 3 service of transmission line patrolling and maintenance by Mysore covers 4 voltage level options (66 kV to 400 kV). Design: outage planning with the utility, permit-to-work and lockout-tagout and insulator and joint inspection. Typically used for industrial captive substations, railway and metro sub-stations and renewable pooling substations. Delivered in line with CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations and IS 10028 (Transformer Installation). Mobilisation Mobilisation in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysore
- Model
- MYS-722 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Mobilisation in 2-3 weeks
- Warranty
- Service credits for avoidable outages
- Standards
- CEA (Measures relating to Safety) Regulations, CEA (Grid Standards) Regulations, IS 10028 (Transformer Installation)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level66 kVMYS-722-01 | Voltage level: 66 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level132 kVMYS-722-02 | Voltage level: 132 kV | 1 month · Mobilisation in 2-3 weeks | on quote |
| Voltage level220 kVMYS-722-03 | Voltage level: 220 kV | 1 month · Baseline condition audit first | on quote |
| Voltage level400 kVMYS-722-04 | Voltage level: 400 kV | 1 month · Baseline condition audit first | on quote |
Specifications
| Voltage level | 66 kV to 400 kV (see variants) |
|---|---|
| Scope | Operation, maintenance and statutory compliancemade to order: Operation and maintenance / Maintenance only |
| Shift pattern | General shift plus on-call |
| Manpower | Engineer plus 6 operatorsmade to order: Two engineers plus 12 staff |
| Line patrolling | Quarterly drone patrolmade to order: Monthly foot patrol |
| Testing | Annual relay and CT/PT test |
| Statutory records | CEIG renewal support |
| Spares | Critical spares by owner |
| Response time | 2 hours for tripmade to order: 4 hours |
| Reporting | Real-time dashboardsmade to order: Monthly fault and maintenance report |
| Term | 3 years |