Turbine condition monitoring, Max 8 seriesSample
by Mysore Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysore Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Turbine condition monitoring from Mysore, Max 8 series: 3 fleet size options between 40 turbines and 150 turbines. Key features: high-voltage switchgear checks, energy loss and curtailment analysis and oil analysis and trend reports. Typically used for captive wind generators, wind farm owners post warranty and repowering and life extension. Delivered in line with IEC 61400-1, IEC 61400-25 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation of crew 2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysore
- Model
- MYS-263 series
- Listing type
- Service
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- Mobilisation of crew 2 weeks
- Warranty
- Availability guarantee with LD
- Standards
- IEC 61400-1, IEC 61400-25, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Fleet size40 turbinesMYS-263-01 | Fleet size: 40 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size80 turbinesMYS-263-02 | Fleet size: 80 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
| Fleet size150 turbinesMYS-263-03 | Fleet size: 150 turbines | 1 nos · Mobilisation of crew 2 weeks | on quote |
Specifications
| Fleet size | 40 turbines to 150 turbines (see variants) |
|---|---|
| Scope | Scheduled maintenance only |
| Turbine class | Up to 1.5 MW |
| Availability guarantee | 97% availabilitymade to order: 95% machine availability |
| Technician team | Site manager plus 2 technicians per 5 turbinesmade to order: Local crew plus rope-access team |
| Blade inspection | Annual drone and rope inspectionmade to order: Semi-annual with repairs |
| Gearbox oil | Annual samplingmade to order: Quarterly sampling and filtration |
| Major components | Excludedmade to order: Included with cap |
| Monitoring | 24x7 remote SCADA |
| Response | 24 hours |
| Term | 1 yearmade to order: 3 years / 5 years |