Catalogue / Installation & erection
Cable laying, termination and earthing installation, Neo 3 seriesSample
by Mysorevidyut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysorevidyut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mysorevidyut Neo 3 cable laying, termination and earthing installation, offered in 6 installation scope options from 1 MW to 100 MW. Highlights: cable route marking and tray fixing, mobile team available for remote sites and module handling to avoid micro-cracks. Suited to utility solar parks, c&I rooftop and ground mount and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysorevidyut
- Model
- MYS-DD9 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 10 days
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWMYS-DD9-01 | Installation scope: 1 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope5 MWMYS-DD9-02 | Installation scope: 5 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope10 MWMYS-DD9-03 | Installation scope: 10 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope25 MWMYS-DD9-04 | Installation scope: 25 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope50 MWMYS-DD9-05 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
| Installation scope100 MWMYS-DD9-06 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Structure and module installationmade to order: Electrical BoP erection / Complete mechanical and electrical erection |
| Manpower deployed | 25 technicians per MW-block |
| Supervision | Project manager, engineers, QA/QCmade to order: Site engineer and safety officer |
| Equipment | Pile driver, crane, telehandler |
| Quality plan | Client-approved ITPmade to order: ISO 9001 QAP with hold points |
| Safety | Daily toolbox talks, PPE, permitsmade to order: Lost-time-injury-free target, HIRA |
| Licence | Electrical contractor licencemade to order: Class A contractor registration |
| Insurance | CAR and workmen compensation |
| Reporting | Weekly report with look-ahead planmade to order: Daily progress report |
| Payment terms | Milestone based with 10% retentionmade to order: Monthly running bills |