Catalogue / Civil & foundation works
Wind turbine foundation construction, Duo seriesSample
by Mysorevidyut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysorevidyut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Mysorevidyut Duo wind turbine foundation construction, offered in 3 works volume options from 5 MW equivalent to 25 MW equivalent. Design: pile layout tolerance maintained to design, monsoon-ready drainage planning and local labour employed where possible. Suited to substations and control rooms, solar parks and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysorevidyut
- Model
- MYS-259 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume5 MW equivalentMYS-259-01 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentMYS-259-02 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentMYS-259-03 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 5 MW equivalent to 25 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing |
| Concrete grade | M30made to order: M25 / M40 for turbine foundation |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | Murram road, 4 m widemade to order: WBM road with culverts / Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Piling rigs and excavatorsmade to order: Batching plant at site |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Item rate with retention |