Catalogue / Civil & foundation works

No photo yet

Wind turbine foundation construction, Duo seriesSample

by Mysorevidyut Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mysorevidyut Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Mysorevidyut Duo wind turbine foundation construction, offered in 3 works volume options from 5 MW equivalent to 25 MW equivalent. Design: pile layout tolerance maintained to design, monsoon-ready drainage planning and local labour employed where possible. Suited to substations and control rooms, solar parks and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mysorevidyut
Model
MYS-259 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume5 MW equivalentMYS-259-01Works volume: 5 MW equivalent1 job · 4-12 weeks executionon quote
Works volume10 MW equivalentMYS-259-02Works volume: 10 MW equivalent1 job · 4-12 weeks executionon quote
Works volume25 MW equivalentMYS-259-03Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume5 MW equivalent to 25 MW equivalent (see variants)
Foundation typeRCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing
Concrete gradeM30made to order: M25 / M40 for turbine foundation
Pull-out testingRandom test plus lateral loadmade to order: 2% piles tested
ReinforcementFe 550Dmade to order: Fe 500D TMT
Roads and drainageMurram road, 4 m widemade to order: WBM road with culverts / Not included
BoundaryChain link fence 2.4 m
QualityCube test reports per pourmade to order: NABL lab testing of materials
MachineryPiling rigs and excavatorsmade to order: Batching plant at site
Duration3-6 monthsmade to order: 4-8 weeks
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited