Catalogue / Cabling, trenching & HDD works

No photo yet

Horizontal directional drilling for road and rail crossings, Volt seriesSample

by Mysorevidyut Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mysorevidyut Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Volt service of horizontal directional drilling for road and rail crossings by Mysorevidyut covers 6 cable route length options (1 km to 50 km). Highlights: drum handling and pulling tension control, warning tape and marker installation and dewatering in high water table. Typically used for railway and highway crossings, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mysorevidyut
Model
MYS-C82 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Mobilisation in 7 days
Warranty
Workmanship 12 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length1 kmMYS-C82-01Cable route length: 1 km1 km · Mobilisation in 7 dayson quote
Cable route length2 kmMYS-C82-02Cable route length: 2 km1 km · Mobilisation in 7 dayson quote
Cable route length5 kmMYS-C82-03Cable route length: 5 km1 km · Mobilisation in 7 dayson quote
Cable route length10 kmMYS-C82-04Cable route length: 10 km1 km · Mobilisation in 7 dayson quote
Cable route length20 kmMYS-C82-05Cable route length: 20 km1 km · Permits may extend timelineon quote
Cable route length50 kmMYS-C82-06Cable route length: 50 km1 km · Permits may extend timelineon quote

Specifications

Cable route length1 km to 50 km (see variants)
MethodTrenchless HDD
HDD capacityUp to 450 mm bore
Trench depth0.9 m
Cable typeLT armouredmade to order: 11/33 kV XLPE
JointingCold shrink
RestorationRoad and footpath restorationmade to order: Backfill and compaction only
PermissionsClient arranges
TestingInsulation and VLF test
Productivity50 m per day HDDmade to order: 300 m per day open trench
CrewHDD crew of 8 with rigmade to order: Trenching team of 15

BARREL: Bharat Atom Renewable Resources Energy Limited