Catalogue / Cabling, trenching & HDD works
Horizontal directional drilling for road and rail crossings, Volt seriesSample
by Mysorevidyut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysorevidyut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Volt service of horizontal directional drilling for road and rail crossings by Mysorevidyut covers 6 cable route length options (1 km to 50 km). Highlights: drum handling and pulling tension control, warning tape and marker installation and dewatering in high water table. Typically used for railway and highway crossings, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysorevidyut
- Model
- MYS-C82 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmMYS-C82-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length2 kmMYS-C82-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length5 kmMYS-C82-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmMYS-C82-04 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length20 kmMYS-C82-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmMYS-C82-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Trenchless HDD |
| HDD capacity | Up to 450 mm bore |
| Trench depth | 0.9 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Cold shrink |
| Restoration | Road and footpath restorationmade to order: Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Insulation and VLF test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | HDD crew of 8 with rigmade to order: Trenching team of 15 |