Catalogue / Cabling, trenching & HDD works
HT cable jointing and termination, Titan seriesSample
by Mysorevidyut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysorevidyut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
HT cable jointing and termination from Mysorevidyut, Titan series: 5 cable route length options between 1 km and 20 km. Design: drum handling and pulling tension control, utility locating before excavation and warning tape and marker installation. Typically used for railway and highway crossings, industrial plant cabling and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysorevidyut
- Model
- MYS-1C5 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmMYS-1C5-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length2 kmMYS-1C5-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length5 kmMYS-1C5-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmMYS-1C5-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | on quote |
| Cable route length20 kmMYS-1C5-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 1 km to 20 km (see variants) |
|---|---|
| Method | Trenchless HDD |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 1.5 m |
| Cable type | 11/33 kV XLPEmade to order: LT armoured |
| Jointing | Cold shrink |
| Restoration | Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 300 m per day open trench |
| Crew | HDD crew of 8 with rigmade to order: Trenching team of 15 |