Catalogue / Testing & commissioning
Solar plant commissioning and performance ratio test, Edge seriesSample
by Mysorevidyut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mysorevidyut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge service of solar plant commissioning and performance ratio test by Mysorevidyut covers 3 plant capacity options (10 MW to 50 MW). Key features: thermography of terminations before charging, test formats agreed before mobilisation and punch list tracked to closure. Used by lender completion tests, EPC handover to owners and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Report in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mysorevidyut
- Model
- MYS-9A9 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Report in 7 days
- Warranty
- As per contract
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity10 MWMYS-9A9-01 | Plant capacity: 10 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity25 MWMYS-9A9-02 | Plant capacity: 25 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity50 MWMYS-9A9-03 | Plant capacity: 50 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 10 MW to 50 MW (see variants) |
|---|---|
| Tests covered | Full plant functional and PR test |
| Instruments | Relay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM |
| Calibration | NABL traceable certificatesmade to order: Calibration valid at test date |
| Team | Commissioning engineer plus 2 testersmade to order: Lead plus 5 member crew |
| Statutory support | CEIG inspection coordination |
| Reports | Commissioning dossier with as-built |
| Duration on site | 3-4 weeksmade to order: 5-7 days / 10-14 days |
| Performance guarantee test | Capacity and PR test per contractmade to order: 72-hour trial run |
| Grid code checks | Reactive power and ramp rate |
| Payment | Milestone on energisation |