Catalogue / Demand response

No photo yet

Aggregation of industrial loads, Eco 4 seriesSample

by Nalanda Corporate Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Eco 4 service of aggregation of industrial loads by Nalanda covers 3 curtailable load options (10 MW to 50 MW). Highlights: settlement transparency, revenue for flexible loads and reduced peak demand charges. Used by commercial buildings, DISCOMs needing peak relief and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nalanda
Model
NAL-B45 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Enrolment 4-8 weeks
Warranty
As per programme terms
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load10 MWNAL-B45-01Curtailable load: 10 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load25 MWNAL-B45-02Curtailable load: 25 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load50 MWNAL-B45-03Curtailable load: 50 MW1 MW · Enrolment 4-8 weeksfor verified buyers

Specifications

Curtailable load10 MW to 50 MW (see variants)
ProgrammeUtility DR
ControlManualmade to order: Automated through SCADA
Notice2 hoursmade to order: Day ahead / 15 minutes
Duration per event1 hourmade to order: 4 hours
Events per yearUnlimitedmade to order: 20 / 50
MeteringExisting meter
Incentive sharing80:20
Baseline methodRegression
ReportingEvent report
Contract term3 yearsmade to order: 1 year

BARREL: Bharat Atom Renewable Resources Energy Limited