Aggregation of industrial loads, Eco 4 seriesSample
by Nalanda Corporate Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco 4 service of aggregation of industrial loads by Nalanda covers 3 curtailable load options (10 MW to 50 MW). Highlights: settlement transparency, revenue for flexible loads and reduced peak demand charges. Used by commercial buildings, DISCOMs needing peak relief and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nalanda
- Model
- NAL-B45 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load10 MWNAL-B45-01 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load25 MWNAL-B45-02 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWNAL-B45-03 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 10 MW to 50 MW (see variants) |
|---|---|
| Programme | Utility DR |
| Control | Manualmade to order: Automated through SCADA |
| Notice | 2 hoursmade to order: Day ahead / 15 minutes |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | Unlimitedmade to order: 20 / 50 |
| Metering | Existing meter |
| Incentive sharing | 80:20 |
| Baseline method | Regression |
| Reporting | Event report |
| Contract term | 3 yearsmade to order: 1 year |