Detailed energy audit for industrial plants, Eco seriesSample
by Nalanda Corporate Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Detailed energy audit for industrial plants from Nalanda, Eco series: 5 connected load options between 1 MW and 50 MW. Highlights: savings quantified with measured data, power factor and harmonics assessment and solar and efficiency retrofit options. Suited to commercial buildings, PAT designated consumers and hospitals and hotels. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nalanda
- Model
- NAL-512 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load1 MWNAL-512-01 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load5 MWNAL-512-02 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load10 MWNAL-512-03 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load25 MWNAL-512-04 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load50 MWNAL-512-05 | Connected load: 50 MW | 1 site · Report in 2-4 weeks | for verified buyers |
Specifications
| Connected load | 1 MW to 50 MW (see variants) |
|---|---|
| Audit level | Detailed audit |
| Instruments | Ultrasonic flow meter, lux metermade to order: Power analyser, thermal camera |
| Auditor | Certified Energy Manager |
| Report | Implementation roadmapmade to order: Savings opportunities with payback |
| Baseline | 12-month bills analysismade to order: Measured baseline |
| Measurement duration | 3 days |
| Coverage | Electricalmade to order: Electrical and thermal / Utilities |
| Statutory | Form-1 and Form-2 filing |
| Deliverable | Report and presentationmade to order: Report and monitoring plan |
| Follow-up | Not included |