Catalogue / Demand response

No photo yet

Aggregation of industrial loads, Duo 2 seriesSample

by Nalanda Corporate Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Aggregation of industrial loads from Nalanda, Duo 2 series: 6 curtailable load options between 0.5 MW and 50 MW. Design: support for grid operators, integration with plant process limits and real-time dashboards. Typically used for DISCOMs needing peak relief, industrial plants with flexible load and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nalanda
Model
NAL-B47 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Assessment in 2-3 weeks
Warranty
As per programme terms
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load0.5 MWNAL-B47-01Curtailable load: 0.5 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load1 MWNAL-B47-02Curtailable load: 1 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load5 MWNAL-B47-03Curtailable load: 5 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load10 MWNAL-B47-04Curtailable load: 10 MW1 MW · Assessment in 2-3 weeksfor verified buyers
Curtailable load25 MWNAL-B47-05Curtailable load: 25 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load50 MWNAL-B47-06Curtailable load: 50 MW1 MW · Enrolment 4-8 weeksfor verified buyers

Specifications

Curtailable load0.5 MW to 50 MW (see variants)
ProgrammeAggregator DRmade to order: Utility DR / TOD optimisation
ControlAutomated through SCADA
NoticeDay ahead
Duration per event1 hour
Events per year50
MeteringDedicated interval meter
Incentive sharing80:20made to order: 70:30 customer:aggregator
Baseline methodRegressionmade to order: 10-day average
ReportingEvent report
Contract term3 years

BARREL: Bharat Atom Renewable Resources Energy Limited