Aggregation of industrial loads, Duo 2 seriesSample
by Nalanda Corporate Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Aggregation of industrial loads from Nalanda, Duo 2 series: 6 curtailable load options between 0.5 MW and 50 MW. Design: support for grid operators, integration with plant process limits and real-time dashboards. Typically used for DISCOMs needing peak relief, industrial plants with flexible load and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nalanda
- Model
- NAL-B47 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWNAL-B47-01 | Curtailable load: 0.5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load1 MWNAL-B47-02 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load5 MWNAL-B47-03 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWNAL-B47-04 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWNAL-B47-05 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWNAL-B47-06 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 0.5 MW to 50 MW (see variants) |
|---|---|
| Programme | Aggregator DRmade to order: Utility DR / TOD optimisation |
| Control | Automated through SCADA |
| Notice | Day ahead |
| Duration per event | 1 hour |
| Events per year | 50 |
| Metering | Dedicated interval meter |
| Incentive sharing | 80:20made to order: 70:30 customer:aggregator |
| Baseline method | Regressionmade to order: 10-day average |
| Reporting | Event report |
| Contract term | 3 years |