Catalogue / Equipment finance & leasing
Capex financing for rooftop solar, Volt seriesSample
by Nalanda Corporate Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Volt service of capex financing for rooftop solar by Nalanda covers 5 facility size options (INR 50 lakh to INR 25 crore). Design: lender comparison across banks and NBFCs, structured around plant cash flow and refinancing options at later stage. Typically used for equipment buyers and vendors, c&I solar owners and IPPs and EPC firms. Delivered in line with RBI Master Directions on NBFCs, Companies Act 2013 and SARFAESI Act 2002. Mobilisation Term sheet in 1-2 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nalanda
- Model
- NAL-553 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Term sheet in 1-2 weeks
- Warranty
- Fee refund if no sanction as per terms
- Standards
- RBI Master Directions on NBFCs, Companies Act 2013, SARFAESI Act 2002
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Facility sizeINR 50 lakhNAL-553-01 | Facility size: INR 50 lakh | 1 job · Term sheet in 1-2 weeks | on quote |
| Facility sizeINR 1 croreNAL-553-02 | Facility size: INR 1 crore | 1 job · Term sheet in 1-2 weeks | on quote |
| Facility sizeINR 5 croreNAL-553-03 | Facility size: INR 5 crore | 1 job · Term sheet in 1-2 weeks | on quote |
| Facility sizeINR 10 croreNAL-553-04 | Facility size: INR 10 crore | 1 job · Disbursement 4-10 weeks | on quote |
| Facility sizeINR 25 croreNAL-553-05 | Facility size: INR 25 crore | 1 job · Disbursement 4-10 weeks | on quote |
Specifications
| Facility size | INR 50 lakh to INR 25 crore (see variants) |
|---|---|
| Structure | Term loan |
| Tenor | 10 years |
| Security | Hypothecation of equipmentmade to order: Corporate guarantee |
| Moratorium | 6 months |
| Interest basis | Floating linked to repomade to order: Fixed rate |
| Processing time | 6-8 weeks |
| Documents | Financials, DPR, quotationsmade to order: KYC, bank statements, project docs |
| Prepayment | Allowed without charges after 12 monthsmade to order: Allowed with charges |
| Insurance | Assets insured, lender as loss payeemade to order: Comprehensive cover required |
| Arranger fee basis | Percentage of facility |