Detailed energy audit for industrial plants, Neo seriesSample
by Nalanda Corporate Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Nalanda Neo detailed energy audit for industrial plants, offered in 3 connected load options from 1 MW to 10 MW. Key features: verification after implementation, solar and efficiency retrofit options and power factor and harmonics assessment. Typically used for PAT designated consumers, commercial buildings and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nalanda
- Model
- NAL-519 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load1 MWNAL-519-01 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load5 MWNAL-519-02 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load10 MWNAL-519-03 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | for verified buyers |
Specifications
| Connected load | 1 MW to 10 MW (see variants) |
|---|---|
| Audit level | Investment-grade audit |
| Instruments | Ultrasonic flow meter, lux meter |
| Auditor | Certified Energy Manager |
| Report | Implementation roadmapmade to order: Savings opportunities with payback |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 14 days |
| Coverage | Electricalmade to order: Electrical and thermal / Utilities |
| Statutory | Form-1 and Form-2 filingmade to order: PAT scheme Form-A |
| Deliverable | Report and presentationmade to order: Report and monitoring plan |
| Follow-up | Verification after implementationmade to order: Not included |