Catalogue / Energy audits

No photo yet

Detailed energy audit for industrial plants, Neo seriesSample

by Nalanda Corporate Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nalanda Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Nalanda Neo detailed energy audit for industrial plants, offered in 3 connected load options from 1 MW to 10 MW. Key features: verification after implementation, solar and efficiency retrofit options and power factor and harmonics assessment. Typically used for PAT designated consumers, commercial buildings and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nalanda
Model
NAL-519 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 2-4 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load1 MWNAL-519-01Connected load: 1 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load5 MWNAL-519-02Connected load: 5 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load10 MWNAL-519-03Connected load: 10 MW1 site · Report in 2-4 weeksfor verified buyers

Specifications

Connected load1 MW to 10 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsUltrasonic flow meter, lux meter
AuditorCertified Energy Manager
ReportImplementation roadmapmade to order: Savings opportunities with payback
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration14 days
CoverageElectricalmade to order: Electrical and thermal / Utilities
StatutoryForm-1 and Form-2 filingmade to order: PAT scheme Form-A
DeliverableReport and presentationmade to order: Report and monitoring plan
Follow-upVerification after implementationmade to order: Not included

BARREL: Bharat Atom Renewable Resources Energy Limited