Catalogue / Gas engines, CHP & cogeneration sets
Trigeneration set with absorption chiller, Elite 5 seriesSample
by Nalandakelvin Rotating Machines (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nalandakelvin Rotating Machines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Elite 5 range of trigeneration set with absorption chiller by Nalandakelvin covers 6 electrical output options (100 kW to 4 MW). Highlights: catalyst for exhaust emission, high total efficiency through heat recovery and pre-assembled container module. Used by textile and pharma units, data centres and dairy and food plants. Designed and tested to ISO 8528, ISO 3046 and IS 4722. Lead time 12-16 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nalandakelvin
- Model
- NAL-682 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 12-16 weeks
- Warranty
- 24 months or 8000 hours
- Standards
- ISO 8528, ISO 3046, IS 4722
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Electrical output100 kWNAL-682-01 | Electrical output: 100 kW | 1 nos · 12-16 weeks | for verified buyers |
| Electrical output250 kWNAL-682-02 | Electrical output: 250 kW | 1 nos · 12-16 weeks | for verified buyers |
| Electrical output500 kWNAL-682-03 | Electrical output: 500 kW | 1 nos · 12-16 weeks | for verified buyers |
| Electrical output1 MWNAL-682-04 | Electrical output: 1 MW | 1 nos · 12-16 weeks | for verified buyers |
| Electrical output2 MWNAL-682-05 | Electrical output: 2 MW | 1 nos · 24-32 weeks | for verified buyers |
| Electrical output4 MWNAL-682-06 | Electrical output: 4 MW | 1 nos · 24-32 weeks | for verified buyers |
Specifications
| Electrical output | 100 kW to 4 MW (see variants) |
|---|---|
| Fuel | Biogasmade to order: Natural gas / CBG / LPG |
| Electrical efficiency | 36%made to order: 40% / 44% |
| Thermal output | 3 MWth |
| Total efficiency | 80%made to order: 88% |
| Heat medium | Steammade to order: Hot water 90/70 C |
| Voltage | 415 Vmade to order: 11 kV |
| Enclosure | Container |
| Grid mode | Islandmade to order: Parallel |
| Chiller | LiBr absorptionmade to order: None |
| Emission | CPCB norms |