Catalogue / Transformer NIFPS

No photo yet

Nitrogen injection fire prevention system, Duo seriesSample

by Nandimark Fire Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nandimark Fire Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Nandimark Duo nitrogen injection fire prevention system, offered in 3 transformer oil volume options from 10-20 kL to 40-60 kL. Key features: no water or foam damage to nearby equipment, control cubicle with status indication to SCADA and fully automatic with manual override. Suited to renewable plant pooling transformers, reactors in EHV yards and generator transformers at plants. Designed and tested to IS 3034, CBIP Manual on Transformers and CEA Safety Regulations 2023. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nandimark
Model
NAN-5C4 series
Listing type
Product
Unit
set
Minimum order
1 set
Lead time
12-16 weeks
Warranty
24 months from commissioning
Standards
IS 3034, CBIP Manual on Transformers, CEA Safety Regulations 2023
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Door delivery in metro cities
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer oil volume10-20 kLNAN-5C4-01Transformer oil volume: 10-20 kL1 set · 12-16 weeksfor verified buyers
Transformer oil volume20-40 kLNAN-5C4-02Transformer oil volume: 20-40 kL1 set · 12-16 weeksfor verified buyers
Transformer oil volume40-60 kLNAN-5C4-03Transformer oil volume: 40-60 kL1 set · 12-16 weeksfor verified buyers

Specifications

Transformer oil volume10-20 kL to 40-60 kL (see variants)
PrincipleDrain and stir
Nitrogen cylinders8 x 68 Lmade to order: 3 x 68 L / 5 x 68 L
Operating pressure150 bar
Oil drain valvePneumatic
DetectionDifferential relay + Buchholz + heat detector
ControlPLC-based cubicle with hot standby
Response timeWithin 30 seconds
Oil drain depthTop 10% of the tank oil
Power supply24 VDC with backup batterymade to order: 110 VDC
Ex-ventIncluded
CommunicationHardwired to SCADAmade to order: IEC 60870-5-104
IsolationCable gland and cubicle IP55

BARREL: Bharat Atom Renewable Resources Energy Limited