Catalogue / Feasibility studies & DPR
Techno-commercial feasibility study for solar projects, Elite seriesSample
by Narmada Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Narmada Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Elite service of techno-commercial feasibility study for solar projects by Narmada covers 5 project capacity options (10 MW to 1 GW). Design: capex and opex benchmarks for Indian market, risk register with mitigations and statutory approvals roadmap. Typically used for industrial captive consumers, developers and IPPs and funds and lenders. Delivered in line with MNRE Guidelines, CERC Tariff Regulations and IEC 61724-1. Mobilisation 3-12 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Narmada
- Model
- NAR-238 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 3-12 weeks
- Warranty
- As per contract
- Standards
- MNRE Guidelines, CERC Tariff Regulations, IEC 61724-1
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project capacity10 MWNAR-238-01 | Project capacity: 10 MW | 1 report · 3-12 weeks | on quote |
| Project capacity50 MWNAR-238-02 | Project capacity: 50 MW | 1 report · 3-12 weeks | on quote |
| Project capacity100 MWNAR-238-03 | Project capacity: 100 MW | 1 report · 3-12 weeks | on quote |
| Project capacity500 MWNAR-238-04 | Project capacity: 500 MW | 1 report · 3-12 weeks | on quote |
| Project capacity1 GWNAR-238-05 | Project capacity: 1 GW | 1 report · 3-12 weeks | on quote |
Specifications
| Project capacity | 10 MW to 1 GW (see variants) |
|---|---|
| Scope | Bankable DPR |
| Energy yield | PVsyst P50/P90made to order: WAsP wind energy assessment |
| Financial model | Project IRR, equity IRR, DSCR |
| Grid assessment | Nearest substation capacity checkmade to order: GNA/connectivity route study |
| Site visit | Two visits with geotech |
| Environmental screening | Includedmade to order: Optional add-on |
| Team | Multi-disciplinary team of 5made to order: Lead consultant and analyst |
| Turnaround | 10-12 weeksmade to order: 3-4 weeks / 6-8 weeks |
| Deliverable | PDF report with Excel modelmade to order: Report, model and presentation |
| Review rounds | One |