Catalogue / Resource assessment (solar, wind, hydro)
Energy yield assessment P50 and P90, Elite 2 seriesSample
by Narmada Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Narmada Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Energy yield assessment P50 and P90 from Narmada, Elite 2 series: 6 measurement duration options between Desktop study and 24 months. Design: loss factors for local conditions, independent bankable estimate and data quality control and filling. Used by lenders needing P90, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Narmada
- Model
- NAR-EB5 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyNAR-EB5-01 | Measurement duration: Desktop study | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration3 monthsNAR-EB5-02 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration6 monthsNAR-EB5-03 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration12 monthsNAR-EB5-04 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration18 monthsNAR-EB5-05 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration24 monthsNAR-EB5-06 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | Desktop study to 24 months (see variants) |
|---|---|
| Technology | Wind |
| Data source | On-site measurementmade to order: Satellite and reanalysis / Hybrid with MCP |
| Equipment | Class A pyranometer stationmade to order: 80-120 m met mast with LiDAR |
| Uncertainty | Bankable assessmentmade to order: P50/P90 with uncertainty budget |
| Modelling | WAsP, WindPROmade to order: PVsyst, SAM |
| Deliverable | Resource reportmade to order: Hourly time series dataset |
| Calibration | Traceable calibration |
| Site count | Single site |
| Maintenance | Quarterly site visitmade to order: Remote health checks |
| Turnaround | Report within 6 weeks of datamade to order: Report in 3 weeks |