Catalogue / Power system studies (load flow, short circuit, grid code)
Grid code compliance study, Smart 9 seriesSample
by Narmada Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Narmada Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Smart 9 service of grid code compliance study by Narmada covers 3 network scale options (33 kV plant to 132 kV system). Highlights: fault level verification of switchgear, PSS/E and PSCAD model support and reports for GNA/connectivity application. Typically used for utilities and consultants, renewable developers seeking connectivity and industrial plants adding generation. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Narmada
- Model
- NAR-4C5 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale33 kV plantNAR-4C5-01 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale66 kV systemNAR-4C5-02 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale132 kV systemNAR-4C5-03 | Network scale: 132 kV system | 1 report · Kick-off in 1 week | for verified buyers |
Specifications
| Network scale | 33 kV plant to 132 kV system (see variants) |
|---|---|
| Study type | Dynamic and transient |
| Software | DIgSILENT PowerFactorymade to order: ETAP / PSS/E |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Model files and relay settings |
| Grid code checks | LVRT/HVRT and ramp ratemade to order: Voltage and reactive power capability |
| Review | Lender reviewmade to order: Utility submission support |
| Scenarios | Multiple dispatch cases |
| Team | Lead plus modelling specialist |
| Turnaround | 4-6 weeksmade to order: 2-3 weeks |
| Validation | Compared with measured data |