Catalogue / Static transfer switches
Dual input source selector, Edge seriesSample
by Narmadakavach UPS Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Narmadakavach UPS Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Narmadakavach Edge dual input source selector, offered in 3 rating options from 250 A to 800 A. Highlights: hot-swap design on rack models, preferred source selection with auto retransfer and thyristor-based switching under 6 ms. Typically used for dual UPS bus architecture, single-corded server loads in data centres and hospital critical loads. Designed and tested to IEC 62310-3, IEC 62310-1 and IEC 62310-2. Lead time 3-4 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Narmadakavach
- Model
- NAR-696 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 3-4 weeks
- Warranty
- 12 months from commissioning
- Standards
- IEC 62310-3, IEC 62310-1, IEC 62310-2
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating250 ANAR-696-01 | Rating: 250 A | 2 nos · 3-4 weeks | for verified buyers |
| Rating400 ANAR-696-02 | Rating: 400 A | 2 nos · 3-4 weeks | for verified buyers |
| Rating800 ANAR-696-03 | Rating: 800 A | 2 nos · 3-4 weeks | for verified buyers |
Specifications
| Rating | 250 A to 800 A (see variants) |
|---|---|
| Phase | 3-phase 4-wire |
| Rated voltage | 415 V AC |
| Transfer time | Below 6 ms |
| Transfer type | Make-before-breakmade to order: Break-before-make |
| Switching device | SCR thyristors |
| Source priority | Preferred source selectable |
| Maintenance bypass | Manual make-before-break |
| Overload | 125% 10 min |
| Efficiency | Above 99% |
| Display | Touchscreenmade to order: LCD |
| Communication | SNMP |
| Mounting | 1U/2U rackmade to order: Floor standing |