Catalogue / Boiler & turbine spares

No photo yet

Superheater coil assembly, Edge seriesSample

by Narmada Power Plant Equipment (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Narmada Power Plant Equipment (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Narmada Edge superheater coil assembly, offered in 3 unit size options from 30 MW to 120 MW. Design: erosion-resistant coatings on blades, material test certificates and IBR forms and NDT reports on every set. Typically used for captive plant O&M, forced outage recovery and life extension projects. Designed and tested to IBR 1950, ASTM A213 and ASTM A210. Lead time 12-20 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Narmada
Model
NAR-FF1 series
Listing type
Product
Unit
set
Minimum order
5 set
Lead time
12-20 weeks
Warranty
12 months
Standards
IBR 1950, ASTM A213, ASTM A210
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR nearest railhead
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Unit size30 MWNAR-FF1-01Unit size: 30 MW5 set · 12-20 weeksfor verified buyers
Unit size60 MWNAR-FF1-02Unit size: 60 MW5 set · 12-20 weeksfor verified buyers
Unit size120 MWNAR-FF1-03Unit size: 120 MW5 set · 12-20 weeksfor verified buyers

Specifications

Unit size30 MW to 120 MW (see variants)
ComponentMill sparesmade to order: Boiler tubes / Superheater / Turbine blades
Tube materialSA 213 T22
Blade material12Cr
OEM compatibilityCompatiblemade to order: BHEL type / Alstom type
Surface treatmentStellite shielding
TestingHydro, UT, DP
Dimensional toleranceAs per OEM drawing
Heat treatmentNormalised and tempered
DocumentationMTC and NDT reports
ConditionNew

BARREL: Bharat Atom Renewable Resources Energy Limited