Catalogue / Furnace & rectifier transformers

No photo yet

Induction furnace transformer, Xtra seriesSample

by Narmadapushpak Power Transformers (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Narmadapushpak Power Transformers (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Induction furnace transformer from Narmadapushpak, Xtra series: 5 rating options between 10 MVA and 100 MVA. Design: rigid winding clamping, high current LV bus design and heavy-duty OLTC for many operations per day. Typically used for aluminium smelters, ferro-alloy plants and steel melting shops. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 28-36 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Narmadapushpak
Model
NAR-641 series
Listing type
Product
Unit
nos
Minimum order
5 nos
Lead time
28-36 weeks
Warranty
24 months
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR site, freight included
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating10 MVANAR-641-01Rating: 10 MVA5 nos · 28-36 weekson quote
Rating20 MVANAR-641-02Rating: 20 MVA5 nos · 28-36 weekson quote
Rating40 MVANAR-641-03Rating: 40 MVA5 nos · 28-36 weekson quote
Rating60 MVANAR-641-04Rating: 60 MVA5 nos · 28-36 weekson quote
Rating100 MVANAR-641-05Rating: 100 MVA5 nos · 28-36 weekson quote

Specifications

Rating10 MVA to 100 MVA (see variants)
Primary voltage11 kVmade to order: 33 kV / 66 kV / 132 kV
Secondary voltageUp to 400 V DC rectified
ApplicationLRF
CoolingOFAF
Tap changerOff-circuitmade to order: OLTC
Secondary tapsUp to 21 steps
Vector groupDy11
Overload20% for 2 hours
Impedance6%made to order: 8%
ReactorIn-builtmade to order: External
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited