Catalogue / Power system studies (load flow, short circuit, grid code)
Harmonic and power quality study, Plus 2 seriesSample
by Nilgiri Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Nilgiri Plus 2 harmonic and power quality study, offered in 5 network scale options from 33 kV plant to 400 kV system. Design: fault level verification of switchgear, models acceptable to STU and CTUIL and reactive power capability curves. Suited to BESS integrators, utilities and consultants and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-4B1 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale33 kV plantNIL-4B1-01 | Network scale: 33 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale66 kV systemNIL-4B1-02 | Network scale: 66 kV system | 1 report · 2-6 weeks | on quote |
| Network scale132 kV systemNIL-4B1-03 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemNIL-4B1-04 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemNIL-4B1-05 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 33 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Dynamic and transient |
| Software | ETAPmade to order: PSS/E / DIgSILENT PowerFactory |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Study report with resultsmade to order: Model files and relay settings |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender review |
| Scenarios | Normal and N-1made to order: Multiple dispatch cases |
| Team | Power system engineermade to order: Lead plus modelling specialist |
| Turnaround | 4-6 weeksmade to order: 2-3 weeks |
| Validation | Peer review |