Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Energy yield assessment P50 and P90, Xtra 4 seriesSample

by Nilgiri Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgiri Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Xtra 4 service of energy yield assessment P50 and P90 by Nilgiri covers 5 measurement duration options (Desktop study to 18 months). Key features: extreme wind and wake studies, long-term correction using reference data and loss factors for local conditions. Used by state agencies mapping resource, wind and solar developers and hybrid project planners. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgiri
Model
NIL-EB2 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
As per contract
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studyNIL-EB2-01Measurement duration: Desktop study1 report · Desktop in 2-3 weekson quote
Measurement duration3 monthsNIL-EB2-02Measurement duration: 3 months1 report · Desktop in 2-3 weekson quote
Measurement duration6 monthsNIL-EB2-03Measurement duration: 6 months1 report · Desktop in 2-3 weekson quote
Measurement duration12 monthsNIL-EB2-04Measurement duration: 12 months1 report · Campaign 3-24 monthson quote
Measurement duration18 monthsNIL-EB2-05Measurement duration: 18 months1 report · Campaign 3-24 monthson quote

Specifications

Measurement durationDesktop study to 18 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceOn-site measurementmade to order: Satellite and reanalysis / Hybrid with MCP
EquipmentClass A pyranometer station
UncertaintyP50/P90 with uncertainty budget
ModellingWAsP, WindPROmade to order: PVsyst, SAM
DeliverableHourly time series datasetmade to order: Resource report
CalibrationCalibration pre and post campaignmade to order: Traceable calibration
Site countMulti-site comparison
MaintenanceQuarterly site visit
TurnaroundReport within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited