Catalogue / Transmission line erection & stringing

No photo yet

Line route clearing and tree-felling support, Xtra seriesSample

by Nilgiri Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgiri Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Line route clearing and tree-felling support from Nilgiri, Xtra series: 3 voltage level options between 220 kV and 765 kV. Key features: sag and tension charts for stringing, tension check and final clearance survey and foundation concrete cube testing. Typically used for industrial supply lines, solar and wind evacuation lines and state transmission utilities. Delivered in line with IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles) and CEA (Measures relating to Safety) Regulations. Mobilisation Material availability dependent; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgiri
Model
NIL-EA8 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Material availability dependent
Warranty
Workmanship 12 months
Standards
IS 802 (Overhead Line Towers), IS 2713 (Steel Tubular Poles), CEA (Measures relating to Safety) Regulations
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Voltage level220 kVNIL-EA8-01Voltage level: 220 kV1 km · Material availability dependenton quote
Voltage level400 kVNIL-EA8-02Voltage level: 400 kV1 km · Material availability dependenton quote
Voltage level765 kVNIL-EA8-03Voltage level: 765 kV1 km · Material availability dependenton quote

Specifications

Voltage level220 kV to 765 kV (see variants)
Circuit typeMulti-circuit on narrow basemade to order: Single circuit / Double circuit
ConductorACSR Moose
ScopeFoundation, erection and stringing
Stringing methodTension stringingmade to order: Conventional stringing
CrewTwo erection gangs plus foundation teammade to order: Gang of 25 per section
Tower testingPrototype test witnessedmade to order: Type-tested towers
Productivity3 km per week
Approvals supportForest and crossing permissionmade to order: PTCC clearance and RoW
SafetyLive-line crossing precautions
InsuranceCAR and workmen compensationmade to order: Third-party liability

BARREL: Bharat Atom Renewable Resources Energy Limited