Catalogue / Testing & commissioning
Pre-commissioning tests and energisation, Ultra seriesSample
by Nilgiri Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Pre-commissioning tests and energisation from Nilgiri, Ultra series: 5 plant capacity options between 10 MW and 250 MW. Highlights: punch list tracked to closure, thermography of terminations before charging and test formats agreed before mobilisation. Suited to repowering projects, EPC handover to owners and lender completion tests. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation 1-2 weeks on site; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-8F1 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- 1-2 weeks on site
- Warranty
- As per contract
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity10 MWNIL-8F1-01 | Plant capacity: 10 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity25 MWNIL-8F1-02 | Plant capacity: 25 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity50 MWNIL-8F1-03 | Plant capacity: 50 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity100 MWNIL-8F1-04 | Plant capacity: 100 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity250 MWNIL-8F1-05 | Plant capacity: 250 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 10 MW to 250 MW (see variants) |
|---|---|
| Tests covered | Transformer, switchgear, relay tests |
| Instruments | Relay test set, thermal camera |
| Calibration | Calibration valid at test date |
| Team | Commissioning engineer plus 2 testers |
| Statutory support | CEIG inspection coordinationmade to order: DISCOM charging support |
| Reports | Commissioning dossier with as-built |
| Duration on site | 3-4 weeksmade to order: 5-7 days / 10-14 days |
| Performance guarantee test | Capacity and PR test per contract |
| Grid code checks | Not includedmade to order: Reactive power and ramp rate |
| Payment | Milestone on energisationmade to order: 50% on start, 50% on report |