Catalogue / Cabling, trenching & HDD works
Horizontal directional drilling for road and rail crossings, Smart seriesSample
by Nilgiri Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Smart service of horizontal directional drilling for road and rail crossings by Nilgiri covers 3 cable route length options (2 km to 10 km). Key features: HDD bore log and as-built survey, utility locating before excavation and traffic management at crossings. Used by urban distribution upgrades, renewable plant internal networks and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-C89 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length2 kmNIL-C89-01 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length5 kmNIL-C89-02 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmNIL-C89-03 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
Specifications
| Cable route length | 2 km to 10 km (see variants) |
|---|---|
| Method | Open trenchmade to order: Trenchless HDD / Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 0.9 m |
| Cable type | 11/33 kV XLPEmade to order: LT armoured |
| Jointing | Cold shrink |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Contractor arranges road cut approvals |
| Testing | Hipot and sheath testmade to order: Insulation and VLF test |
| Productivity | 50 m per day HDD |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |