Catalogue / Civil & foundation works
Control room and substation building construction, Duo seriesSample
by Nilgiri Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Control room and substation building construction from Nilgiri, Duo series: 4 works volume options between 10 MW equivalent and 100 MW equivalent. Highlights: cube and pile test records, waterproofing for cable trenches and local labour employed where possible. Used by industrial plants, solar parks and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-3B8 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume10 MW equivalentNIL-3B8-01 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentNIL-3B8-02 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume50 MW equivalentNIL-3B8-03 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume100 MW equivalentNIL-3B8-04 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 10 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | Ramming or screw pile |
| Concrete grade | M40 for turbine foundationmade to order: M25 / M30 |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | Not includedmade to order: Murram road, 4 m wide / WBM road with culverts |
| Boundary | Chain link fence 2.4 m |
| Quality | NABL lab testing of materialsmade to order: Cube test reports per pour |
| Machinery | Batching plant at sitemade to order: Piling rigs and excavators |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Item rate with retention |