Catalogue / Solar & wind BoP construction
Wind farm BoP and internal electrical works, Volt seriesSample
by Nilgiri Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Volt service of wind farm BoP and internal electrical works by Nilgiri covers 3 project size options (5 MW to 25 MW). Key features: cable tray and glanding workmanship, compliance with site safety plan and earth pit resistance records. Used by c&I ground mount, wind-solar hybrid parks and IPPs managing multiple packages. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-8C5 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 14 days
- Warranty
- Defect liability 24 months
- Standards
- IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size5 MWNIL-8C5-01 | Project size: 5 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size10 MWNIL-8C5-02 | Project size: 10 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size25 MWNIL-8C5-03 | Project size: 25 MW | 1 MW · Mobilisation in 14 days | on quote |
Specifications
| Project size | 5 MW to 25 MW (see variants) |
|---|---|
| Scope | Complete BoP except modulesmade to order: Cabling and earthing / Civil plus electrical BoP |
| DC cables | 6 sq mm solar cablemade to order: 4 sq mm solar cable |
| MV cables | 33 kV XLPE Al armoured |
| Inverter station | Skid or containerised |
| Lightning protection | ESE systemmade to order: Franklin rod with mast |
| Crew size | 80 persons |
| Equipment | Own fleet |
| Quality | Megger and continuity recordsmade to order: QAP with stage inspection |
| Duration | 6-9 months |
| Payment | Milestone based |