Catalogue / Solar plant O&M & module cleaning
Robotic and waterless module cleaning, Smart seriesSample
by Nilgiri Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Robotic and waterless module cleaning from Nilgiri, Smart series: 5 plant capacity options between 5 MWp and 100 MWp. Key features: thermography twice a year, soiling loss tracking and inventory and spares ledger. Suited to c&I rooftop owners, IPP solar parks and group captive plants. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Baseline audit before takeover; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-662 series
- Listing type
- Service
- Unit
- MWp
- Minimum order
- 1 MWp
- Lead time
- Baseline audit before takeover
- Warranty
- Availability guarantee with penalty
- Standards
- IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWpNIL-662-01 | Plant capacity: 5 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity10 MWpNIL-662-02 | Plant capacity: 10 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity25 MWpNIL-662-03 | Plant capacity: 25 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity50 MWpNIL-662-04 | Plant capacity: 50 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity100 MWpNIL-662-05 | Plant capacity: 100 MWp | 1 MWp · Baseline audit before takeover | on quote |
Specifications
| Plant capacity | 5 MWp to 100 MWp (see variants) |
|---|---|
| Scope | Cleaning and routine checks |
| Cleaning method | Robotic |
| Cleaning frequency | Fortnightly |
| Availability guarantee | Grid availability 99.5% |
| Manpower | 1 engineer plus 4 technicians per 10 MW |
| Spares | Consumables included |
| Monitoring | Weekly PR and PLF reportmade to order: 24x7 remote SCADA |
| Response time | 24 hoursmade to order: 4 hours for critical faults |
| Reporting | Monthly generation reportmade to order: Dashboard access for lenders |
| Contract term | 5 years |