Catalogue / Civil & foundation works

No photo yet

Pile foundations for module mounting structures, Max seriesSample

by Nilgiri Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgiri Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Pile foundations for module mounting structures from Nilgiri, Max series: 3 works volume options between 25 MW equivalent and 100 MW equivalent. Highlights: cube and pile test records, pile layout tolerance maintained to design and daily quantity and progress log. Typically used for industrial plants, wind farms and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgiri
Model
NIL-1C3 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume25 MW equivalentNIL-1C3-01Works volume: 25 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume50 MW equivalentNIL-1C3-02Works volume: 50 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume100 MW equivalentNIL-1C3-03Works volume: 100 MW equivalent1 job · Mobilisation in 10 dayson quote

Specifications

Works volume25 MW equivalent to 100 MW equivalent (see variants)
Foundation typeRamming or screw pile
Concrete gradeM40 for turbine foundationmade to order: M25 / M30
Pull-out testing2% piles tested
ReinforcementFe 500D TMTmade to order: Fe 550D
Roads and drainageWBM road with culvertsmade to order: Murram road, 4 m wide / Not included
BoundaryChain link fence 2.4 mmade to order: Compound wall with barbed wire
QualityCube test reports per pour
MachineryBatching plant at sitemade to order: Piling rigs and excavators
Duration3-6 monthsmade to order: 4-8 weeks
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited