Catalogue / Furnace & rectifier transformers
Electric arc furnace transformer, Pro 5 seriesSample
by Nilgirispark Transformer Works (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgirispark Transformer Works (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Nilgirispark Pro 5 electric arc furnace transformer, offered in 5 rating options from 5 MVA to 60 MVA. Design: optional built-in series reactor, heavy-duty OLTC for many operations per day and withstands frequent short-circuit duty. Used by aluminium smelters, chlor-alkali and ferro-alloy plants. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 28-36 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgirispark
- Model
- NIL-2B6 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 28-36 weeks
- Warranty
- 36 months from supply
- Standards
- IS 2026, IEC 60076, IEC 61378-1
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating5 MVANIL-2B6-01 | Rating: 5 MVA | 1 nos · 28-36 weeks | on quote |
| Rating10 MVANIL-2B6-02 | Rating: 10 MVA | 1 nos · 28-36 weeks | on quote |
| Rating20 MVANIL-2B6-03 | Rating: 20 MVA | 1 nos · 28-36 weeks | on quote |
| Rating40 MVANIL-2B6-04 | Rating: 40 MVA | 1 nos · 28-36 weeks | on quote |
| Rating60 MVANIL-2B6-05 | Rating: 60 MVA | 1 nos · 28-36 weeks | on quote |
Specifications
| Rating | 5 MVA to 60 MVA (see variants) |
|---|---|
| Primary voltage | 11 kV |
| Secondary voltage | Up to 1000 Vmade to order: Up to 400 V DC rectified |
| Application | SAF |
| Cooling | OFWFmade to order: ONAN/ONAF / OFAF |
| Tap changer | OLTCmade to order: Off-circuit |
| Secondary taps | Up to 21 steps |
| Vector group | Dy11made to order: Dd0 |
| Overload | 20% for 2 hours |
| Impedance | 6% |
| Reactor | In-built |
| Bushings | High-current plate type |
| Monitoring | Online DGA optional |