Electric arc furnace transformer, Pro 5 seriesSample

by Nilgirispark Transformer Works (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgirispark Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Nilgirispark Pro 5 electric arc furnace transformer, offered in 5 rating options from 5 MVA to 60 MVA. Design: optional built-in series reactor, heavy-duty OLTC for many operations per day and withstands frequent short-circuit duty. Used by aluminium smelters, chlor-alkali and ferro-alloy plants. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 28-36 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgirispark
Model
NIL-2B6 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
28-36 weeks
Warranty
36 months from supply
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating5 MVANIL-2B6-01Rating: 5 MVA1 nos · 28-36 weekson quote
Rating10 MVANIL-2B6-02Rating: 10 MVA1 nos · 28-36 weekson quote
Rating20 MVANIL-2B6-03Rating: 20 MVA1 nos · 28-36 weekson quote
Rating40 MVANIL-2B6-04Rating: 40 MVA1 nos · 28-36 weekson quote
Rating60 MVANIL-2B6-05Rating: 60 MVA1 nos · 28-36 weekson quote

Specifications

Rating5 MVA to 60 MVA (see variants)
Primary voltage11 kV
Secondary voltageUp to 1000 Vmade to order: Up to 400 V DC rectified
ApplicationSAF
CoolingOFWFmade to order: ONAN/ONAF / OFAF
Tap changerOLTCmade to order: Off-circuit
Secondary tapsUp to 21 steps
Vector groupDy11made to order: Dd0
Overload20% for 2 hours
Impedance6%
ReactorIn-built
BushingsHigh-current plate type
MonitoringOnline DGA optional